New Work, Five-piece wall installation

    5 piece modular wall installation entitled, “Becoming.”  The installation can be configured vertically, horizontally, or in a grouping.  Each of the 5 pieces has hanger permanently affixed to the back, simplying the hanging process.

    Becoming 3

    “Becoming,” reclaimed glass wall installation arranged in a grouping.

    Becoming

    “Becoming,” reclaimed glass wall installation arranged vertically.

    Becoming Detail

    “Becoming,” detail showing close up of one of the five components of the wall installation.

    Tags: